Gallery



Click on pictures for larger versions that will open in a separate window.


Existing metal roof Spray foam installed Benchmark base
coat applied
Benchmark top
coat applied




MR system installed
on 25000 s.f.
for UBC
Ply system installed
on grain silos
150 in the air
Garnet, KS
Foam and coatings
on tar and
gravel for Topeka
Housing Authority
Spray foam on
hotel roof east wing
Air shot of
52000 sq feet
foam and coatings
over tar and
gravel hotel






Existing EPDM roof
cleaned and primed

Applying base coat Applying top coat Completed roof now
85% reflective vs the
previous reflectivity
value of less than 10%




Salt Dome when
we arrived to
job site
Salt Dome power
washed and primed
with tack coat
Spraying the dome
from the lift
Completed Dome back
to tan color





Built up
that had to
be torn down
to metal decking

During tear off
and recovery board
being mechanically fastened to the
metal deck
Base coat on
the foam ready
for top coat
Completed project
with tan top coat





Rusted and deteriorated
metal shop roof
Maintain white
rust inhibiting
maintenance coating




Prep work for
spray foam over
an existing tar
and gravel roof
Crickets foamed in
to aid in drainage
to scuppers before
the field of
the roof recieved
full foam application
Spray Foam being
installed to the
cleaned gravel surface
Finished project with
4-inches of foam
and Benchmark coatings





Overland Park, KS
Price Chopper project


Gravel Surface with
some foam sprayed

3/4 of roof
with foam applied
Main gravel
section completed
Spray foam around
and under bulky
mechanical equipment
Mechanical equipment





Spray foam over metal
twin peaked roof

Benchmark base coat
going down over foam
Benchmark top coat
installed for final coat
One year picture
after completion
One year picture
after completion